Project Portfolio

Hornsdale Battery Energy Storage System (BESS) - Stage 2 Extension

Client: Consolidated Power Projects Australia Pty Ltd

Location: Hornsdale (near Jamestown), South Australia

Summary:

 

Phase 1 – Earthworks Construction:

  • Surveying and set-out
  • Site compound area
  • Temporary construction laydowns.
  • Permanent site access roads
  • Battery-yard bench
  • Substation bench
  • Drainage
  • Implementation of temporary and permanent environmental controls.

Phase 2 – Civil Construction:

  • Earthgrid excavation and backfilling
  • Electrical cable trenching and backfilling
  • Excavation and installation of conduits
  • Foundation excavations
  • Construction of foundations, slabs and bored pier footings
  • Yard fencing and gates

 

 

Farrell Flat Road Bridge Upgrade

Client: McConnell Dowel (with Department of Transport and Infrastructure)

Location: Farrell Flat Rd, Spring Farm, South Australia

Summary:

 

  • Surveying and set-out
  • Detour road works including spray seal
  • Construction of access track and road maintenance
  • Removal of 2 bridge structures including controlled demolition, separate and load out all materials
  • Installation of 2 bridge structures including:
    • Foundation excavation
    • Installation of blinding concrete
    • Supply and installation of steel reinforcing
    • Installation of culverts and bases (200t crane)
    • Installation of formwork
    • Placing of structural concrete
    • Engineered back filling/stabilised sand
    • Grouting and waterproofing
  • Road shoulder pavement works
  • Installation of safety barriers and roadside furniture
  • Installation of rock rip and rap channel works
  • Implementation of temporary and permanent environmental controls
  • Erection of property fencing and gate access

 

Yawong Wind Farm

Client: Consolidated Power Projects (with BayWa)

Location: Yawong Hills (near St Arnaud)

Summary:

 

  • Surveying and set-out including service locating
  • Facilitate Testing, Geotechnical investigations and Engineering Assessment
  • Construction of Access tracks and road maintenance
  • Construction of wind turbine laydown/crane hardstands
  • Installation of drainage including culverts, pipes and headwalls
  • Construction of rock-lined drains, swales and outlet structures
  • Construction of wind turbine generator foundations, including:
    • Blasting of rock within foundation excavations
    • Foundation excavation
    • Installation of blinding concrete
    • Assembly and fitting of steel boltdown structure
    • Supply and installation of steel reinforcing
    • Installation of formwork
    • Placing of structural concrete
    • Engineered back filling
    • Grouting and waterproofing
  • Implementation of temporary and permanent environmental controls
  • Erection of property fencing and gate access
  • Construction of site compounds and laydown areas
  • Construction of stair landing and concrete pads
  • Trenching of underground electrical cabling

Coober Pedy Wind Farm

Client: Senvion

Location: Coober Pedy, South Australia

Summary:

 

  • Construction of wind turbine generator foundations, including:
    • construction of drainage culverts
    • construction of crane hardstands
    • construction of access tracks
    • civil and electrical design
    • installation of blinding concrete
    • supply and installation of steel reinforcing
    • installation of form work
    • placing of structural concrete
    • engineered back filling.
  • Implementation of temporary and permanent environmental controls.
  • Construction of site compound area.
  • Electrical balance of plant construction.

OTM Civil Construction Group

ABN: 24 594 453 878

ACN: 609 242 220

Builders Licence: BLD 270903

Contact

t: 08 8830 6380

183 Main North Road

PO Box 1112  CLARE, SA 5453

Copyright 2018 - OTM Civil Construction Group

Project
Portfolio